Project Overview

Overview:

The project comprised three phases:

  • Phase 1 involved repairing the main Pumping Station, featuring 2,000 gpm centrifugal pumps, a chlorination system, an emergency generator, and extensive piping.
  • Phase 2 focused on repairing Sanitary and Industrial Sewer Lines using different construction methods such as cured-in-place pipe installation, open cut, and new manholes.
  • Phase 3 centered on fixing the drainage section, demanding precise coordination by the contractor to navigate existing utilities, minimize utility outages, and ensure smooth traffic flow.

Details:

  • The site work encompassed yard piping, utilities, site grading, chain link fencing, and an asphalt parking area.
  • Yard piping installation was finished while ensuring coordination with the user to prevent any disruptions to the current water supply.
  • The project involved the demolition of the existing pump station.
  • Surface restoration was carried out as needed to restore paved and landscaped areas to their original condition.